Logo

Playground@Landscape

YOUR FORUM FOR PLAY, SPORTS UND LEISURE AREAS

Slide 0
Slide 1
Slide 2
Slide 6
Slide 7
Slide 8
17.08.2011 - Ausgabe: 4/2011

Damming, squirting and diverting at Deutschen Eck

by Gerhard Hauber, Atelier Dreiseitl GmbH

Photo

With all these specifications in mind, we finally developed the Water Experience playground. As its name says, and in contrast to the other three themed play areas on the BUGA site, main point of focus in this playground is to experience water. Only a few steps away from the "Deutschen Eck" area on the river promenade in Koblenz, both children and adults can experience water in a varied and multifaceted way at seven play stations. The basic idea of the concept was to transpose important characteristics of water which occur along a river into play experiences. In this way topics such as 'source', 'spring', 'wave', 'labyrinth', 'lake', 'lookout' and 'final destination' were chosen. At these stations water can be dammed, diverted, sprayed, squirted and patterns of current or standing waves can be created, all interactive, influenced in a variety of ways and controllable.

The stations were all designed and developed especially for this playground with the water experiences themselves being developed and tested as models on a 1:1 scale in our studios. In some cases these models were then taken as plans for the originals by the construction companies.

The strong, colourful floor covering of the play island is made up of seamless impact protection flooring, coloured according to the overall colour concept of the BUGA 2011 with focus on red and oranges. The remaining area is made of yellow-beige coloured concrete with an additional coating where it comes into contact with the water.

The stations are embedded in a three-dimensional, softly modulating ground sculpture which suggests a water catchment area. The water in the stations flows on different levels and through different routes towards the "Final destination" where it disappears in a dramatic way. As a side note, this design also simplifies the cleaning process after flooding as the whole playground can simply be hosed down with the dirt collecting at the lowest point where it can be removed. A further advantage is the accessibility of the whole playground to wheelchairs as slopes were determined beforehand in cooperation with organisations for the disabled. Some play objects have also been positioned slightly higher than the others so that they can be used by people sitting in wheelchairs, and even the springs (floor jets) can be influenced by the tyres wheels of a wheelchair.

Stepping and sitting stones have been included throughout the whole playground. These serve to help people cross the water-covered areas and keep their feet dry. The surface reliefs on these elements were designed and created by students between the ages of 6 and 16 years at a nearby school. The designs, worked into clay tablets, were used to make negatives and these were then laid in the moulds used to manufacture the stepping and sitting stones. The work of local citizens was greatly valued by the people responsible for the BUGA in the hope that their identification with the buildings and objects created will reduce or prevent vandalism - success in other projects allows this hope to be upheld.

Also important for the targeted development of playground elements is an early and continuing cooperation with the test inspection authorities (TÜV). Details of the objects were already discussed several times with the authorities during the planning phase and further developments determined using pictures of the models so that the building approval was really only a matter of form.

The water technology presented a particular challenge as the whole plant needed to be built in a safe way with regard to flooding. This meant that all underground shafts and manholes were built to withstand pressure. Any openings in the ground were given additional covers which could be screwed tight if the danger of flooding threatened in order to prevent entry of silt and other sediments. The electricity supply was installed to lie above the level of the "flood of the century". The playground was also purposely flooded during the building work in order to carry out a test of the whole plant and allowing one or other weak point to be corrected.

The playground is separated from the "Danziger Freiheit" area by closely placed benches which provide an optical boundary to the very popular footpath and bikeway. A beer garden is included in the northern boundary ensuring that parents can be catered for if their children cannot be persuaded to move on and leave the playground.
 

Mehr zum Thema Coverstory

image

Coverstory

Tourism and leisure industry: Current trends and the importance of the family segment

Both tourism and the leisure industry are important economic sectors as well as indispensable partners in shaping individual lifestyles. In the coming years...

image

Coverstory

On the way to sustainable and resilient urban development or how to achieve a transformation towards more openness and aesthetics

All over the world, cities and regions are currently facing comprehensive transformation processes: social and demographic change, climate change, scarcity of resources, digitisation and new technologies are ...

image

Coverstory

The schoolyard as an exercise-oriented social space in all-day schools

The expansion of all-day schools has been an issue for quite some time now, and is currently becoming even more important against the backdrop of the introduction of a nationwide legal entitlement to full-day care for children of ...

image

Coverstory

Water playgrounds, urban climate and more - Water playgrounds as an important element of climate adaptation

re we still allowed to plan with water in public spaces in times of heat and drought, in times when rivers have dried up and when there is even a shortage of drinking water in some places? Especially during this year's hot summer, this question has been asked frequently, particularly in connection with public water features. However...

image

Coverstory

Hood Training: Social Work. Lifestyle. Movement.

Lack of perspectives for children and young people from developing neighbourhoods is unfortunately quite often the rule and endangers the future of many young people who are not satisfied with such a stagnation of personal development. Hood Training provides ...

image

Coverstory

Familyfriendliness as a public attraction – Playgrounds in tourism, leisure parks and retail trade

Nowadays, playgrounds are considered an integral part of the design of public space. However, it is not only the municipalities that invest in attractive and modern playgrounds these days. Playgrounds have also become very important in other economic areas. Be it ...